A New Concept in Industrial Development in Tijuana, B.C.
494.211 ACRES industrial project, carefully conceived and planned to meet current needs.
The project stands out for its orderly and sustainable growth.
DETAILED PLANNING
Industrial Platforms: The industrial park has more than 1.3 million m2 of industrial platforms, designed to house warehouses of different sizes.
COMPLEMENTARY AREAS: The project includes commercial, electrical and donation areas, integrating all the necessary elements for comprehensive development.
SUSTAINABLE GROWTH: Detailed planning ensures orderly and sustainable growth.
– Border with California
– Accessible location
– Feasibility:
* Urban Impact, Road Integration, MIA Industrial Land Use Opinion. (90% complete in its paperwork)
*Industrial Energy Feasibility: It will have its own SUB-STATION with more than 95 Megawatts, already approved by CENACE for industrial use. Ensuring KVA needs
*Water Feasibility (33 liters per second of drinking water)
*Water Treatment
* Nearby Labor
Available Platforms
P1. 190,916.22M2
P-1A 87,196.92 M2
P-1B 103,719.30 M2
P-2 424,938.53 M2
P-2 L1 97,914.37 M2
P-2 L2 86,135.39 M2
P-2 L3 86,698.66 M2
P-2 L4 139,322.79 M2
P-3 215,593.25 M2
P3-L1 109,067.11 M2
P3-L2 106,526.14 M2
P-4 257,959.23 M2 P4-L1 58,573.72 M2 P4-L2 56,196.27 M2 P4-L3 143,189.24 M2
31 km from International Otay Border.